Southampton Civic Centre

More Case Studies like this

Project Summary

Product: Fire alarm and detection, induction loop
Total value: £164,000
Programme: 24 weeks
Project type: Offices

This project comprised of the refurbishment of an existing historical and iconic office structure, stripped back to sub-structure and re-built to meet building regulations and provide the local council with a modern, economical energy efficient office space.

The fire alarm and DDA services installed were to provide safety and protection for both the building and all personnel within the offices and surrounding areas. Full networked disabled toilet alarm system integrated with the disabled refuge system for the site was designed to ensure the latest DDA requirements were met.

We provided design, installation and commissioning for this two year project at one of Southampton’s most iconic landmarks.